/wbPlan — Live Demo () ​

What /wbPlan (v5.1 — Cost-Aware) would actually do on wb-labs right now. The active plan, prior reports, and memory state below are real. Plans now include Est. (min · kt) token estimates and a 💰 Budget Summary.


1. Live target ​

FieldLive value
Active planreports/<date>/plans/plan_wb-core_20260504.md (3 rows, all ⬜ Done & Valid)
Most recent prior plan(none — this is the only active plan in the workspace)
Open continue-tomorrow handoverNone recorded
Memory rules for planningfeedback_model_selection.md (the agent/the agent declaration before action), project_docs_edition.md (docs structural rules)
Live multi-session workThe current docs v4 sync — uncommitted but not yet captured in any plan

The third row is the noteworthy one. The current docs work is happening without a corresponding plan, which is the situation /wbPlan --focus="docs_v4_sync" would address.


2. What each input form would resolve to today ​

InputLive resolution
"WBC.js decomposition steps"Reads memory + the existing wb-core plan; would produce 3-5 rows for a planned decomposition. Likely conflicts with row 3 of the active plan (which already names this work).
"docs v4 sync remaining work"New plan, focus=docs. ~24 rows (the QA group remainder + 5 other groups).
core2/packages/wb-core/src/WBC.jsFile-as-target — produces refactor rows for that file.
--resumeHalt — no prior plan to resume from.
--id="3" -d (against active plan)Both cells of row 3 → ⏸️. Row 3 (WBC.js decomposition) gets deferred.

3. Per-flag behavior, applied live ​

Flag combinationLive result
"docs v4 sync remaining" (no flag)Plan written; uses default scope=local (which means wb-core context). Imperfect — docs work isn't a wb-core task. Better to add --focus.
"docs v4 sync remaining" --focus="docs"Plan written under the right focus. Memory rules from project_docs_edition.md apply.
--focus="docs" --continue-tomorrowSame as above + handover header summarizing today's progress.
--id="3" -d against active planBoth cells of row 3 (WBC.js decomposition) → ⏸️. Useful given row 3 is currently DAG-blocked anyway.
--id="3" -c against active planBoth cells → 🚫. Cancels the WBC.js decomposition row entirely. Riskier — the work might still be needed; -d is usually the right call.
--wbPlan flagRejected: self-chaining is circular.
--resumeHalt — no prior plan in scope.

4. Pipelines on this exact workspace ​

📋/wbPlan Live Execution & Carryover Simulator
Pipeline A — Create a Docs-Specific Plan/wbPlan --focus="docs_v4_sync" --continue-tomorrow
> /wbPlan --focus="docs_v4_sync" --continue-tomorrow
[SYSTEM] Plan focus: docs_v4_sync.
[CONTEXT] Reading project_docs_edition.md & transmission spec...
[GENERATE] 30 plan rows with budget estimation.
[WRITE] reports/20260504/plans/plan_docs_v4_sync_20260504.md
Generated Plan File Output (plan_docs_v4_sync_20260504.md)
#Task DescriptionVerification CriteriaDepEst (min · kt)DoneValid
1Generate wbReview dual files (sim + demo)files exist; ~150-line each—20 · 12k⬜⬜
2Generate wbPlan dual filesfiles exist; ~150-line each—20 · 12k⬜⬜
3Generate wbGit dual filesfiles exist; ~150-line each—20 · 12k⬜⬜
4Generate wbContext dual filesfiles exist; ~150-line each—20 · 12k⬜⬜
5Generate wbRefactor dual filesfiles exist; ~150-line each420 · 12k⬜⬜
6Generate wbClean dual filesfiles exist; ~150-line each420 · 12k⬜⬜
💰 Budget Estimate: 30 tasks | ~360k tokens | Cost: ~$1.44 (fast) / ~$5.40 (big thinker)

💠 Pipeline A — Create a docs-specific plan (the right plan for this session) ​

The current docs work is happening without a plan. Running /wbPlan --focus="docs_v4_sync" --continue-tomorrow ingests memory rules (project_docs_edition.md) and calculates task rows with token & budget estimates (~$1.44 fast model / ~$5.40 big thinker).

Key Takeaway: The handover header generated in the plan file is what makes multi-day sessions seamless if work is paused overnight.

💠 Pipeline B — Defer row 3 of the active wb-core plan ​

Running /wbPlan --id="3" -d is an explicit state-only mutation. Both cells (Done and Valid) flip to ⏸️ Deferred without executing code.

Key Takeaway: Using -d records "this work is on hold intentionally" in .wb/ reports, preventing DAG-blocked tasks from looking like passive neglect in standup reviews.

💠 Pipeline C — The --resume refusal & carryover ​

When launching a new session with /wbPlan --resume, wb-flow scans prior plan state:

  • Incomplete rows (⬜ Done / ⬜ Valid) are carried over to tomorrow's new plan file.
  • Explicitly deferred rows (⏸️) are NOT carried over by design.

Key Takeaway: --resume is for carrying incomplete work (⬜), respecting explicit deferral decisions (⏸️). If you wish to reactivate a deferred row later, use /wbPlan --id="3" -o.


5. What would refuse today ​

TriggerLive response
/wbPlan with no descriptionHalt — need a target or --resume.
/wbPlan --resume (no prior plan)Halt — currently no resumable plan in this workspace.
/wbPlan --wbPlanRejected — self-chaining is circular.
/wbPlan --id="3" without a state flagHalt — --id on /wbPlan only valid with -o/-d/-c.
/wbPlan --id="99" -dHalt — row doesn't exist.
/wbPlan --task="magic"Halt — unknown category.
/wbPlan --scope="monorepo" "fix everything"Warns about coarse-grained plans being hard to action; produces the plan anyway with the warning recorded in the handover header.
/wbPlan "implement WBC.js decomposition" (already covered by row 3)Notice: row 3 already exists for this work. Does not duplicate; suggests /wbWork --id="3" or /wbPlan --id="3" -o to revive if deferred.

The pattern: /wbPlan is the dual-cell authority and the source of every plan file. It refuses to duplicate existing rows, refuses circular self-chaining, refuses to fabricate work for vague inputs, and treats deferred rows as "do not auto-resume" by design. The plan file is a snapshot, the handover header is the narrative, and the dual-cell privilege is the cleanup primitive that no other command can perform.